Oura Pump Station Switchroom and HV Upgrade

Project Overview

Location: Oura Pump Station
Client: Goldenfields Water

Goldenfields Water County Council (GWCC) owns and operates the Oura Pump Station. Raw water is extracted using four (4) bores and then treated at Oura Pump Station by way of aeration, chlorination and fluoridation before pumping to balance tanks at Junee for distribution.

The Oura pump station was built in 1975. The power transformers, High Voltage Cables, protection system and control system are 44yrs old. The Oura pump station is critical infrastructure. Pump station reliability is being compromised by as a direct result of the high voltage assets experiencing failures and reliability issues due to age.

This project aims to to replace the aged high voltage assets with new, current technology from the essential energy point of connection to the motors. The replacement includes the LV switchgear and control gear.

RIC Services

Switchboard Installation

General light and Power

Transformer Installation

HV Cable Installation and Termination 3.3kV and 11kV

Installation of 2x new POA poles for 11kV incomers

Instrumentation supply and Installation

Earthing grid with lightning air terminals and Pits

Cable ladder design and Installation

Fire Installation

1

2 (2)

2

3 (2)

3

4 (2)

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

29

30

31

1 (2)